Assignment:
50m x 25m ALTO Twin hangar with two 24m diameter rotating decks for 8 aircrafts each.
Date:
2003
Project description:
Prior to the construction, the most cost efficient placement of the building was determined,
considering all possible future hangar positions. The project was executed in the winter
months 2002/2003, without any delay and at the initially planned costs.